Dubai Harbour bridge nears completion: What it means for your daily commute
Once completed, the bridge is expected to reduce travel time along the corridor from 12 minutes to just 3 minutes, providing a faster commute
26 January, 2026
TT
16
Dubai’s Roads and Transport Authority (RTA) has announced that 65 per cent of construction work has been completed on a 1,500-metre bridge connecting Sheikh Zayed Road to Dubai Harbour, the Middle East’s largest yacht marina and a flagship waterfront destination.
The dual-lane bridge in each direction is designed to significantly enhance connectivity and ease congestion, offering direct access to and from the iconic Dubai Harbour. The project is scheduled for completion in the third quarter of this year, according to a report by Dubai Media Office.
The project contractor has already completed 90 per cent of work related to upgrading and adjusting utility services intersecting with the bridge. In parallel, approved traffic diversions have been implemented to maintain smooth flow for commuters while allowing construction to progress according to schedule.
Read more-Inside Dubai RTA’s Oud Maitha Road upgrade: Faster commutes for 420,000 residents
Mattar Al Tayer, director general and chairman of the Board of Executive Directors of the RTA, emphasised the strategic importance of the project.
“This project reflects the directives of our leadership to develop an integrated infrastructure that supports the rapid urban and economic growth witnessed by Dubai,” he said.
Al Tayer added that the initiative exemplifies effective collaboration between RTA and strategic private-sector partners, ensuring road and transport projects are closely aligned with urban development plans, particularly along the emirate’s waterfront. “Such coordination enhances mobility, supports quality of life, and strengthens Dubai’s position as a leading global city to live, work, and invest,” he said.
Reducing journey times
The bridge will extend from Interchange 5 on Sheikh Zayed Road, near the American University in Dubai, pass through the intersection of Al Naseem Street and Al Falak Street, and cross King Salman bin Abdulaziz Al Saud Street before connecting to Dubai Harbour Street.
Spanning 1,500 metres with two lanes in each direction, the bridge will handle up to 6,000 vehicles per hour. The project also includes at-grade improvement works at four key intersections: Interchange 5 on Sheikh Zayed Road, Al Falak Street with Al Naseem Street, King Salman bin Abdulaziz Al Saud Street with Al Naseem Street, and Dubai Harbour Street.
Once completed, the bridge is expected to reduce travel time along the corridor from 12 minutes to just 3 minutes, providing a faster, more efficient commute for residents and visitors.
Boosting Dubai Harbour as a maritime destination
Abdulla Binhabtoor, CEO of Shamal Holding, highlighted the strategic value of the bridge for Dubai Harbour. “Dubai Harbour Bridge represents a significant advancement in infrastructure connecting the city to its waterfront, further strengthening Dubai Harbour’s position as a fully integrated and highly connected maritime destination,” he said.
Binhabtoor added that the project demonstrates Shamal’s long-term vision for creating iconic destinations that elevate Dubai’s urban and architectural landscape. “Our planning is informed by a deep understanding of how destinations evolve, allowing us to invest at the right time and support seamless, sustainable experiences for residents and visitors,” he said.
“The bridge enhances daily commutes to and from Dubai Harbour through its direct link to Sheikh Zayed Road, improving quality of life while reflecting the leadership’s vision for world-class connectivity,” Binhabtoor concluded.
Dubai Harbour: A waterfront hub
Dubai Harbour enjoys a prime location between Bluewaters Island and Palm Jumeirah, near landmarks including the Burj Al Arab. The destination combines residential, retail, and leisure offerings, and is currently undergoing a major development spanning 1.5km.
The project includes a residential complex of 24 towers and approximately 7,500 apartments, further solidifying Dubai Harbour’s status as a vibrant, integrated waterfront community.
With the bridge nearing completion, Dubai is poised to enhance its urban mobility infrastructure while supporting the growth of a world-class maritime destination, signaling continued investment in infrastructure that drives both economic growth and quality of life.


















